Bio Pure System Septic Tank Installations
The Bio Pure Sewage Treatment System is an ideal solution for Septic Tank Installations. It can be retrofitted to existing septic tanks or installed as part of a new build’s sewage treatment system. Bio Pure Tech Ltd supply and fit systems from single dwelling sewage / water treatment systems up to large scale septic tank installations for commercial premises, schools, agricultural and public facilities.
Bio Pure System Demonstration
Building a new home?
We also carry out all essential ground works for new builds including foundations, sewerage systems, pipe-work, rainwater piping and drainage, as well as for electrical and other utilities.
If you are in the early stages of your build or in the planning stage, give us a call and we would be happy to call out and advise on all required groundwork and piping.
For reference, take a look at some of our recent projects around the country here
About Grants
Did you know that there are grants available to help fund the costs of sewage treatment and getting your system certified compliant?
From 2012 all septic tanks have to be registered and certified, to comply with EU water treatment codes of practice.
To avail of grants, existing septic tanks have to be registered and then inspected. Local authorities arrange the inspections and will recommend remedial action if required.
Grants for remedial works are available provided you meet the qualifying criteria. Full details can be found at:
Note that grants are still available even though the above website stipulates lapsed qualifying dates.
Call us on 086 1520035 and we will be happy to answer questions about grants and help guide you through the process.
Some useful general information links on septic tanks, water treatment and grant availability can be found at the bottom of the page.
How The Bio Pure System Works
This is where the sewage is aerobically treated. The sewage is completely broken down, breaking the solids into small particles.
With aeration there is no sewage smells from the tank.
Maximum aeration duration is 12 hours (9am - 9pm).
The aeration process is switched off and the settlement process begins.
All small particles settle to the bottom of the tank, and the treated effluent moves to the top of the tank.
Settlement process duration is 6 hours (9pm - 3am).