Installing a concrete treatment tank and tertiary treatment plant

Here, our ground team are installing a large treatment tank plus a new tertiary treatment plant. The tertiary treatment system is the newest technology in sewage and waste water treatment which further improves the effluent quality, removing toxins and other biological factors.

If you would like to know more about the tertiary treatment system, contact us and we will be happy to answer your questions.

IMG-20181102-WA0000

IMG-20181102-WA0001

IMG-20181102-WA0002

IMG-20181102-WA0003

IMG-20181102-WA0004

Upgrading an existing septic tank with the bio pure treatment system

Here are some finishing and landscaping pics of a job we did in May in Dundalk. We upgraded an existing septic tank with the Bio Pure treatment system and installed a new percolation area. The Bio Pure control unit is located discreetly amongst existing plants and shrubs. Lawn is raked back and re-seeded so the finished job is virtually invisible after a few weeks.

Tidying up groundworks after installation
Tidying up groundworks after installation
Excavated area is raked back and levelled
Excavated area is raked back and levelled
Bio Pure unit is located in amongst existing plants to be discreet
Bio Pure unit is located in amongst existing plants to be discreet

Replacing an old sewage system

Here’s a job we did in Duleek, County Meath, replacing an old non-working system with a new sewage system and drainage.

Old sewage tank de-commissioned
Old sewage tank de-commissioned
Excavating for new treatment tank location
Excavating for new treatment tank location
Placement and location of sewage tanks are carefully planned, then excavated.
Placement and location of sewage tanks are carefully planned, then excavated.
Drainage materials delivered
Drainage materials delivered
Tank installation
Tank installation
Groundwork and backfill
Groundwork and backfill
Laying drainage piping and backfilling.
Laying drainage piping and backfilling.

Bio Pure Treatment System retrofit to an existing sewage system in Athlone

For this job, we retrofitted and upgraded an old existing septic tank with our Bio Pure system, which treats the effluent to a high quality and pumps off the treated waste water to the percolation area. We also dug out and installed the new percolation area.
Sometimes working in enclosed or mature gardens presents us with challenges getting equipment and material to site, but we are used to working in all conditions. At the end of all jobs, we are always careful to put back soil and driveway materials and leave things as tidy as possible.

Laying the pipework, power lines and control unit for the Bio Pure system.
Laying the pipework, power lines and control unit for the Bio Pure system.
Capping off the old outlet
Capping off the old outlet

3more pipes

Backfilling pipework
Backfilling pipework

5digger filling

Laying the pipes
Laying the pipes
Backfilling and landscaping to finish the installation
Backfilling and landscaping to finish the installation