We are happy to take on any size jobs, from the smallest to large scale industrial treatment plants. We do our best to get out to customers within a couple of working days of contact. For emergencies, we can call out immediately if required.

An installation of a retrofit Bio Pure System generally takes no longer than a day or two. Installation of septic tanks, percolation areas and pipework would typically take a little longer as there is some groundwork involved, and equipment, tanks, pipes, gravel and other parts would need to be ordered and delivered to site. We also factor in some time at the end of a job to tidy up, rake back soil or gravel and leave things in a neat and working state.